| The Olympic Dam operation
is connected to the state electricity
supply grid via transmission
lines from Port Augusta and
Pimba. At present, the average
load is 120 megawatts.
The proposed development may
require about 300-400 megawatts
of additional power.
|
|
Possible power sources being
investigated to meet the base
load are:
- an additional transmission
line from the state electricity
supply grid
- natural gas pipeline and
onsite power generation
- renewable options are being
assessed to augment the base
load requirement.
An additional transmission
line from the state electricity
supply grid supplemented by
renewable energy is being considered. |
|
| Last
Updated
25 September, 2007
|